In a region where energy is vital for growth and development, the establishment of two strategically positioned LPG stations, one to the east and the other to the west of Tamanrasset, marks a crucial step forward. This project encompasses meticulous testing, pre-commissioning, and commissioning processes for a comprehensive range of essential components. From gas cisterns to advanced SCADA system integration, our efforts underscore our commitment to delivering top-tier infrastructure solutions that ensure safety and efficiency. These LPG stations are set to play a pivotal role in meeting energy demands and driving progress in the region.
This project includes two LPG stations; the first is following east of Tamanrasset and the second west of Tamanrasset. Testing pre-commissioning and commissioning consist of:
• 08 gas cisterns
• Boiler
• Vaporizer
• Detente station
• Emergency generator and Transformer station
• Air compressor and gas compressor
• Fire protection network
• Gas and water detection system
• Gas and water pipes
• Wiring relating to the SCADA system and MCC cabinets
In conclusion, the establishment of these two LPG stations, strategically positioned east and west of Tamanrasset, represents a significant milestone in enhancing energy infrastructure. The meticulous testing, pre-commissioning, and commissioning processes encompass a comprehensive range of critical components, from gas cisterns to sophisticated SCADA system integration. This project exemplifies our unwavering dedication to delivering top-tier infrastructure solutions, ensuring both safety and efficiency. As these LPG stations come to life, they will play a pivotal role in meeting energy demands while contributing to the growth and development of the region.